Grand Forks English Coulee Water Quality Improvement and Public Outreach

ENGLISH COULEE WATER IMPROVEMENT AND PUBLIC OUTREACH Grand Forks, North Dakota About the Project The English Coulee meanders through Grand Forks, North Dakota and has many important uses to the City. The coulee not only provides drainage and interior flood protection storage, but it also serves a pedestrian walking/biking corridor and provides recreation opportunities such […]
Woodbury SCADA Design and Implementation

WOODBURY SCADA DESIGN AND IMPLEMENTATION Woodbury, Minnesota About the Project The City of Woodbury encountered major challenges with their SCADA system, drawing attention to the need for replacement. AE2S assisted with the design process and provided technical expertise and collaboration for the SCADA system design update. Project Details Date: 2017 – 2018 Client: City of […]
Fargo Membrane Water Treatment Plant and Improvements Electrical Engineering

FARGO MEMBRANE WATER TREATMENT PLANT AND IMPROVEMENTS ELECTRICAL ENGINEERING Fargo, North Dakota About the Project The Fargo Water Treatment Plant uses membrane filtration and reverse osmosis to disinfect raw water prior to distribution. Reverse osmosis is an electrical energy intensive treatment technology and its implementation necessitated multiple electrical distribution system upgrades. Project Details Date: 2010 […]
Colorado Springs Utilities Rampart Dam Valve Condition Assessment

RAMPART DAM VALVE CONDITION ASSESSMENT Colorado Springs, Colorado About the Project Colorado Springs Utilities (CSU) has numerous pump and valve stations throughout its system that are confidential for security reasons and extremely important to operations. AE2S was hired to assess valves, electrical, SCADA, and other items in a key tunnel adjacent to the dam, including […]
Great Falls Water Storage Assessment and Related Improvements

WATER STORAGE ASSESSMENT AND RELATED IMPROVEMENTS Great Falls, Montana About the Project The City of Great Falls maintains several water storage facilities located within its distribution system. In 2012, the City retained AE2S to conduct detailed assessments for five steel storage facilities. The Seasonal Clearwell at the Water Treatment Plant (WTP) site (2 million-gallon ground […]
Great Falls Water Treatment Plant Solids Mitigation

WATER TREATMENT PLANT SOLIDS MITIGATION Great Falls, Montana The Need for the Project The Great Falls WTP treats water from the Missouri River using a series of processes, including a traveling bar screen to remove large debris from the raw water intake stream and sedimentation/filtration, utilizing aluminum sulfate (alum) as the primary coagulant, to remove […]
Bozeman Pear Street Booster Station Rehabilitation

Pear Street Booster Station Rehabilitation Bozeman, Montana The Need for the Project The City of Bozeman retained AE2S to rehabilitate the Pear Street booster station. The project allows the City to maximize its use of Lyman Spring water, which requires no treatment and flows by gravity into a portion of the distribution system. The project […]
Helping Brandon Using GIS to Identify Storm Drainage Needs

USING GIS TO IDENTIFY STORM DRAINAGE NEEDS Brandon, South Dakota About the Project The City of Brandon is a growing community in southeastern South Dakota. Like other communities, Brandon is facing the challenge of providing new infrastructure to support growth, while also maintaining its existing systems. In 2019, the City determined that an overall plan […]
Kalispell GIS and Water Modeling Integration

GIS AND WATER MODELING INTEGRATION Kalispell, Montana About the Project In 2017, AE2S was tasked with providing services to the City of Kalispell to review the status of the water system, adjust planning criteria, identify current and future challenges, and to develop a Capital Improvement Plan (CIP), which will ensure the City will be able […]
Williston GIS Improvements

GIS IMPROVEMENTS Williston, North Dakota About the Project The City of Williston worked to develop, implement, and establish a long-term preventative and condition-based maintenance program for equipment and infrastructure assets within the Public Works, Wastewater, Water, and Engineering Departments. The City’s goal was to implement a Computerized Maintenance Management System (CMMS) to provide a GIS-centric […]