BDM Rural Water SCADA Upgrade

SCADA UPGRADE Britton, South Dakota About the Project BDM Rural Water knew that its SCADA system was outdated and needed improvements. To determine the best path forward, BDM selected AE2S to perform a SCADA System Needs Assessment to develop a plan for upgrading the SCADA system. Project Details Date: 2019 – 2020 Client: BDM Rural […]
Grand Forks Water, Wastewater, and Stormwater SCADA

WATER, WASTEWATER, AND STORMWATER SCADA Grand Forks, North Dakota About the Project The AE2S Instrumentation and Controls (I&C) team has been providing General Services for the Utility System Controls on a case-by-case basis since 2002, working with the City to ensure that its control system performs as it should. Project Details Date: 2002 – Present […]
Grand Forks UND School of Medicine and Health Sciences

UND SCHOOL OF MEDICINE AND HEALTH SCIENCES Grand Forks, North Dakota About the Project AE2S served as the civil engineer on the design team led by JLG Architects for a new School of Medicine and Health Sciences (SMHS) on the UND Campus. The new facility is prominently located on a seven-acre site at the corner […]
Minnetonka Ridgedale Booster Station Improvements

RIDGEDALE BOOSTER STATION IMPROVEMENTS Minnetonka, Minnesota About the Project The City of Minnetonka identified the need to rehabilitate the Ridgedale Booster Station and selected AE2S for the design, bidding, and construction phase services for the project. The booster station rehabilitation includes the removal and replacement of the entire existing electrical equipment, including electrical for three […]
Rapid City Dinosaur Park Accessibility Improvements

DINOSAUR PARK ACCESSIBILITY IMPROVEMENTS Rapid City, South Dakota About the Project Working as a subconsultant, AE2S was tasked with surveying, scanning, and performing ADA checks on the project to upgrade the local attraction that spans nearly 40 acres and hosts thousands of visitors every year. Project Details Date: 2021 Client: Tallgrass Landscape Architecture Key Project […]
Minnetonka Water Treatment Plant Electrical Upgrades

MINNETONKA WATER TREATMENT PLANT ELECTRICAL UPGRADES Minnetonka, Minnesota About the Project The City of Minnetonka has eight small water treatment plants (WTPs) which each consist of one remote submersible well, one vertical turbine well, two booster pumps, and two filters. The age of all electrical equipment within the WTPs was beyond its useful life, and […]
UND Steam Plant

UND STEAM PLANT Grand Forks, North Dakota Project Details Date: 2018 – 2020Client: Johnson Controls Structural and Civil Engineering Services for Steam Generating Plant AE2S was retained to provide structural and civil engineering services for the construction of a 300,000 #/hour, 16,200 GSF multi-story steam generating plant that replaced the aging coal-fired steam generating plant. […]
Grand Forks Regional WTP Structural Engineering

GRAND FORKS REGIONAL WTP STRUCTURAL ENGINEERING Grand Forks, North Dakota Project Details Date: 2015 – 2020Client: City of Grand Forks The Need for a New Regional Water Treatment Plant The Grand Forks Regional Water Treatment Plant (GFRWTP) is a 20 million gallons per day hybrid water treatment facility that includes a parallel conventional and membrane […]
Fargo Water Treatment Plant Control System Upgrade

WATER TREATMENT PLANT CONTROL SYSTEM UPGRADE Fargo, North Dakota About the Project An Instrumentation and Control System Needs Assessment performed by AE2S showed that the Water Treatment Facility’s Supervisory Control and Data Acquisition (SCADA) System was outdated and out of support with no upgrade path. With no support options, the facility was at risk in […]
Fargo Red River Pump Station 3D Scanning

RED RIVER PUMP STATION 3D SCANNING Fargo, North Dakota About the Project The City of Fargo’s Red River Pump Station serves as the primary pumping facility to supply source water to its 45 million gallon per day (MGD) Water Treatment Plant (WTP). To accommodate the increased demands brought on by the addition of West Fargo […]