AE2S is Advanced Engineering and Environmental Services

WATER, WASTEWATER, AND STORMWATER SCADA

Grand Forks, North Dakota

About the Project

The AE2S Instrumentation and Controls (I&C) team has been providing General Services for the Utility System Controls on a case-by-case basis since 2002, working with the City to ensure that its control system performs as it should.

Project Details

Date: 2002 – Present

Client: City of Grand Forks

Key Project Elements
  • System Upgrades
  • Long-term Support / On-Call Services
  • Six Filters

Commitment to Keep Control Systems Up-to-Date and Fully Functional

AE2S has been an integral part in ongoing system improvements for the City that include the Water Treatment Plant, Wastewater Treatment Facility, Water Distribution Systems, Wastewater Collection Systems, and Stormwater Collection Systems. Specific services provided under this contract have included:
  • Software upgrades
  • Radio telemetry system troubleshooting and repair
  • Reporting services for the Water Treatment Plant
  • Flood protection system support
  • Sanitary lift station support
  • Hardware and equipment upgrades
  • Water tower and distribution system calibrations
  • Emergency services (24/7/365)
AE2S strives to help the City of Grand Forks maintain an up-to-date and fully functional control system throughout the entire City.