Grand Forks Water, Wastewater, and Stormwater SCADA

Grand Forks Water, WW, and Stormwater SCADA

WATER, WASTEWATER, AND STORMWATER SCADA Grand Forks, North Dakota About the Project The AE2S Instrumentation and Controls (I&C) team has been providing General Services for the Utility System Controls on a case-by-case basis since 2002, working with the City to ensure that its control system performs as it should. Project Details Date: 2002 – Present […]

North Dakota DWR Strategic Governance and Finance Study

Strategic Governance and Finance Study

STRATEGIC GOVERNANCE AND FINANCE STUDY North Dakota Regional Water Systems About the Project The North Dakota Department of Water Resources (DWR) selected AE2S to conduct a comprehensive study of Strategic Governance and Finance of the four main regional water systems in North Dakota. Project Details Date: 2020 – 2021 Client: North Dakota Department of Water […]

Western Area Water Supply Authority Missouri River Bathymetric Survey

Missouri River Bathymetric Survey

MISSOURI RIVER BATHYMETRIC SURVEY Williston, North Dakota About the Project Closure of Garrison Dam in the mid 20th century reduced flow velocities in the areas upstream of the dam, which has induced significant sediment deposition, most notably in the vicinity of Williston, North Dakota. The City of Williston, in conjunction with the Western Area Water […]

Grand Forks English Coulee Water Quality Improvement and Public Outreach

English Coulee Water Quality Improvement and Public Outreach

ENGLISH COULEE WATER IMPROVEMENT AND PUBLIC OUTREACH Grand Forks, North Dakota About the Project The English Coulee meanders through Grand Forks, North Dakota and has many important uses to the City.  The coulee not only provides drainage and interior flood protection storage, but it also serves a pedestrian walking/biking corridor and provides recreation opportunities such […]

Traill County Economic Development Commission

Traill County Economic Development Commission

TRAILL COUNTY ECONOMIC DEVELOPMENT COMMISSION Traill County, North Dakota About the Project AE2S Communications worked with the Traill County Economic Development Commission to create strategy and messaging to support the “Come Home to Traill” tagline. The goal of this initiative is to attract workforce, businesses, and developers to the community. Project Details Client: Traill County […]

Fargo Membrane Water Treatment Plant and Improvements Electrical Engineering

Fargo Membrane WTP and Improvements Electrical Engineering

FARGO MEMBRANE WATER TREATMENT PLANT AND IMPROVEMENTS ELECTRICAL ENGINEERING Fargo, North Dakota About the Project The Fargo Water Treatment Plant uses membrane filtration and reverse osmosis to disinfect raw water prior to distribution. Reverse osmosis is an electrical energy intensive treatment technology and its implementation necessitated multiple electrical distribution system upgrades. Project Details Date: 2010 […]

Rugby Wind Turbine Surveying Services

Rugby Wind Turbine Surveying Services

RUGBY WIND TURBINE SURVEYING SERVICES Rugby, North Dakota About the Project AE2S was hired by Wanzek Construction to provide surveys for the Rugby Wind Turbine Project in Pierce County, North Dakota during the summer of 2008. Project Details Date:  2008 – 2009 Client:  Wanzek Construction Key Project Elements Wetland Staking Control for Construction Staking Centerline […]

Williams County Freshwater and Produced Water Gathering System

Freshwater and Produced Water Gathering System

FRESHWATER AND PRODUCED WATER GATHERING SYSTEM Williams County, North Dakota About the Project Hydraulic design of parallel high density polyethylene (HDPE) pipelines for the purpose of gathering production water from oil extraction pads and delivering freshwater to the client for fracking and wellbore maintenance. Review of design drawings and cross referencing service connections with North […]

Williston Airport Ditch Repair

Williston, ND Airport Ditch Repairs

AIRPORT DITCH REPAIR Williston, North Dakota About the Project An extreme rainfall event on June 11, 2021, resulted in damage to drainage infrastructure, including the Airport Ditch, which is a drainage channel that extends approximately 7,200 feet through the City. A 1,000-foot section of the channel, with a contributing watershed area of approximately 3,227 acres, […]

Potato Processing Facility Reuse

AE2S Industrial services, I&C and water reuse

Potato Processing Facility Reuse and I&C Grand Forks, North Dakota AE2S has led multiple screening projects to remove potato solids from process water loops, enabling water reuse, including handling 2,500 GPM process water streams, screening 150,000 lbs/hr of potato peels, and managing 2.5 MGD of plant wastewater. In addition, AE2S provides 24/7 I&C and startup […]