Woodbury SCADA Design and Implementation
WOODBURY SCADA DESIGN AND IMPLEMENTATION Woodbury, Minnesota About the Project The City of Woodbury encountered major challenges with their SCADA system, drawing attention to the need for replacement. AE2S assisted with the design process and provided technical expertise and collaboration for the SCADA system design update. Project Details Date: 2017 – 2018 Client: City of […]
Great Falls WTP and Distribution System SCADA Improvements
GREAT FALLS WTP AND DISTRIBUTION SYSTEM SCADA IMPROVEMENTS Great Falls, Montana About the Project AE2S assisted the City of Great Falls with the development of a scheduled maintenance program for the WTP control system and its associated instrumentation and hardware. The City contracted AE2S to complete this preventative maintenance, as well as perform all on-call […]
Rocky Boy’s/North Central Montana Regional Water System SCADA Services
SCADA SERVICES North Central Montana About the Project The Rocky Boy’s/North Central Montana Regional Water System (RB/NCMRWS) Project is intended to address the water quantity and quality challenges of the Rocky Boy’s Reservation and numerous off-reservation communities, water districts, and other water utilities represented by the North Central Montana Regional Water Authority (NCMRWA). Project Details […]
Aurora North Campus Communication Study
NORTH CAMPUS COMMUNICATION STUDY Aurora, Colorado About the Project The City of Aurora selected AE2S to perform two separate, but interconnected studies. The first portion of the study evaluated the existing fiber optic line between the North Campus Server Room and South Campus Server Room. Project Details Date: 2021 – Present Client: City of Aurora […]
OSRWSS Mni Wiconi WTP PLC Upgrades and SCADA Improvements
WTP PLC UPGRADES AND SCADA IMPROVEMENTS Ft. Pierre, South Dakota About the Project The Oglala Sioux Rural Water Supply System (OSRWSS) receives treated water from the Mni Wiconi Water Treatment Plant (WTP) in Ft. Pierre, SD. OSRWSS then distributes the treated drinking water to four different rural water systems. These include: The Oglala Sioux Rural […]
BDM Rural Water SCADA Upgrade
SCADA UPGRADE Britton, South Dakota About the Project BDM Rural Water knew that its SCADA system was outdated and needed improvements. To determine the best path forward, BDM selected AE2S to perform a SCADA System Needs Assessment to develop a plan for upgrading the SCADA system. Project Details Date: 2019 – 2020 Client: BDM Rural […]
Grand Forks Water, Wastewater, and Stormwater SCADA
WATER, WASTEWATER, AND STORMWATER SCADA Grand Forks, North Dakota About the Project The AE2S Instrumentation and Controls (I&C) team has been providing General Services for the Utility System Controls on a case-by-case basis since 2002, working with the City to ensure that its control system performs as it should. Project Details Date: 2002 – Present […]
Fargo Water Treatment Plant Control System Upgrade
WATER TREATMENT PLANT CONTROL SYSTEM UPGRADE Fargo, North Dakota About the Project An Instrumentation and Control System Needs Assessment performed by AE2S showed that the Water Treatment Facility’s Supervisory Control and Data Acquisition (SCADA) System was outdated and out of support with no upgrade path. With no support options, the facility was at risk in […]
Tiber County Water District Control Systems Upgrade
CONTROL SYSTEMS UPGRADE Conrad, Montana About the Project Due to the age and proprietary nature of the existing control system, Tiber County Water District realized the need for a system upgrade in order to increase reliability, efficiency, and functionality. The previous telemetry system was a proprietary and obsolete telephone tone system using paper chart recorders […]
Watertown Municipal Utilities Water System Controls Improvements
WATER SYSTEM CONTROLS IMPROVEMENTS Watertown, South Dakota About the Project The aging infrastructure within the Water Treatment Plant (WTP) created reliability and operation and maintenance issues for Watertown Municipal Utilities (WMU). As a result, WMU retained AE2S to design and build a 6.8 MGD expansion of the existing WTP, along with a new well field […]