Grand Forks Regional Water Treatment Plant Electrical System

GRAND FORKS REGIONAL WTP ELECTRICAL ENGINEERING Grand Forks, North Dakota Project Details Date: 2015 – 2016Client: City of Grand Forks About the Project The new Grand Forks Regional Water Treatment Plant (WTP) is capable of treating raw water from either of the City’s source waters with a treatment capacity between 16 and 20 million gallons […]
Williston Public Works Facility

WILLISTON PUBLIC WORKS FACILITY Williston, North Dakota About the Project The rapid growth resulting from the Bakken shale oil play caused Williston to look at construction of a new public works facility. AE2S assisted the City with selection of an architect and a construction manager at-risk for the project. Once an architect was selected, AE2S […]
Burnsville SCADA Integration and Control Systems

SCADA INTEGRATION AND CONTROL SYSTEMS Burnsville, Minnesota About the Project AE2S was instrumental in the City of Burnsville’s SCADA and controls system improvements design and implementation in 2008. We continue to be the City’s sole provider of SCADA services including site rehabilitation controls design and consulting, controls improvements budgeting, PLC programming, SCADA programming, and site […]
Watertown Municipal Utilities Water System Controls Improvements

WATER SYSTEM CONTROLS IMPROVEMENTS Watertown, South Dakota About the Project The aging infrastructure within the Water Treatment Plant (WTP) created reliability and operation and maintenance issues for Watertown Municipal Utilities (WMU). As a result, WMU retained AE2S to design and build a 6.8 MGD expansion of the existing WTP, along with a new well field […]
Fargo Red River Pump Station 3D Scanning

RED RIVER PUMP STATION 3D SCANNING Fargo, North Dakota About the Project The City of Fargo’s Red River Pump Station serves as the primary pumping facility to supply source water to its 45 million gallon per day (MGD) Water Treatment Plant (WTP). To accommodate the increased demands brought on by the addition of West Fargo […]
Fargo Water Treatment Plant Control System Upgrade

WATER TREATMENT PLANT CONTROL SYSTEM UPGRADE Fargo, North Dakota About the Project An Instrumentation and Control System Needs Assessment performed by AE2S showed that the Water Treatment Facility’s Supervisory Control and Data Acquisition (SCADA) System was outdated and out of support with no upgrade path. With no support options, the facility was at risk in […]
Minnetonka Water Treatment Plant Electrical Upgrades

MINNETONKA WATER TREATMENT PLANT ELECTRICAL UPGRADES Minnetonka, Minnesota About the Project The City of Minnetonka has eight small water treatment plants (WTPs) which each consist of one remote submersible well, one vertical turbine well, two booster pumps, and two filters. The age of all electrical equipment within the WTPs was beyond its useful life, and […]
Rapid City Dinosaur Park Accessibility Improvements

DINOSAUR PARK ACCESSIBILITY IMPROVEMENTS Rapid City, South Dakota About the Project Working as a subconsultant, AE2S was tasked with surveying, scanning, and performing ADA checks on the project to upgrade the local attraction that spans nearly 40 acres and hosts thousands of visitors every year. Project Details Date: 2021 Client: Tallgrass Landscape Architecture Key Project […]
Minnetonka Ridgedale Booster Station Improvements

RIDGEDALE BOOSTER STATION IMPROVEMENTS Minnetonka, Minnesota About the Project The City of Minnetonka identified the need to rehabilitate the Ridgedale Booster Station and selected AE2S for the design, bidding, and construction phase services for the project. The booster station rehabilitation includes the removal and replacement of the entire existing electrical equipment, including electrical for three […]
Grand Forks Water, Wastewater, and Stormwater SCADA

WATER, WASTEWATER, AND STORMWATER SCADA Grand Forks, North Dakota About the Project The AE2S Instrumentation and Controls (I&C) team has been providing General Services for the Utility System Controls on a case-by-case basis since 2002, working with the City to ensure that its control system performs as it should. Project Details Date: 2002 – Present […]