Bozeman Drought Resiliency Planning

Bozeman Drought Resiliency Planning

DROUGHT RESILIENCY PLANNING Bozeman, Montana About the Project Situated near the headwaters of the Gallatin River watershed, the City of Bozeman has an advantageous location with respect to pristine water quality, but the City is extremely dependent on snowmelt runoff and adequate snowpack, along with natural and constructed reservoir storage, to provide an adequate supply […]

North Dakota DWR Strategic Governance and Finance Study

Strategic Governance and Finance Study

STRATEGIC GOVERNANCE AND FINANCE STUDY North Dakota Regional Water Systems About the Project The North Dakota Department of Water Resources (DWR) selected AE2S to conduct a comprehensive study of Strategic Governance and Finance of the four main regional water systems in North Dakota. Project Details Date: 2020 – 2021 Client: North Dakota Department of Water […]

Aurora North Campus Communication Study

Aurora North Campus Communication Study

NORTH CAMPUS COMMUNICATION STUDY Aurora, Colorado About the Project The City of Aurora selected AE2S to perform two separate, but interconnected studies. The first portion of the study evaluated the existing fiber optic line between the North Campus Server Room and South Campus Server Room. Project Details Date: 2021 – Present Client: City of Aurora […]

Great Falls WTP and Distribution System SCADA Improvements

WTP and Distribution System SCADA Improvements

GREAT FALLS WTP AND DISTRIBUTION SYSTEM SCADA IMPROVEMENTS Great Falls, Montana About the Project AE2S assisted the City of Great Falls with the development of a scheduled maintenance program for the WTP control system and its associated instrumentation and hardware. The City contracted AE2S to complete this preventative maintenance, as well as perform all on-call […]

Great Falls Gore Hill Pump Station Electrical Improvements

Great Falls Gore Hill Pump Station Electrical Improvements

GORE HILL PUMP STATION ELECTRICAL IMPROVEMENTS Great Falls, Montana About the Project The City of Great Fall enlisted AE2S to complete the final design of electrical improvements at the Gore Hill Pump Station. The pump station consists of three split-case horizontal booster pumps, ranging from 75-200 horsepower, with an approximate capacity of 4 million gallons […]

Grand Forks English Coulee Water Quality Improvement and Public Outreach

English Coulee Water Quality Improvement and Public Outreach

ENGLISH COULEE WATER IMPROVEMENT AND PUBLIC OUTREACH Grand Forks, North Dakota About the Project The English Coulee meanders through Grand Forks, North Dakota and has many important uses to the City.  The coulee not only provides drainage and interior flood protection storage, but it also serves a pedestrian walking/biking corridor and provides recreation opportunities such […]

Woodbury SCADA Design and Implementation

Woodbury SCADA Design and Implementation

WOODBURY SCADA DESIGN AND IMPLEMENTATION Woodbury, Minnesota About the Project The City of Woodbury encountered major challenges with their SCADA system, drawing attention to the need for replacement. AE2S assisted with the design process and provided technical expertise and collaboration for the SCADA system design update. Project Details Date: 2017 – 2018 Client: City of […]

Fargo Membrane Water Treatment Plant and Improvements Electrical Engineering

Fargo Membrane WTP and Improvements Electrical Engineering

FARGO MEMBRANE WATER TREATMENT PLANT AND IMPROVEMENTS ELECTRICAL ENGINEERING Fargo, North Dakota About the Project The Fargo Water Treatment Plant uses membrane filtration and reverse osmosis to disinfect raw water prior to distribution. Reverse osmosis is an electrical energy intensive treatment technology and its implementation necessitated multiple electrical distribution system upgrades. Project Details Date: 2010 […]

Colorado Springs Utilities Rampart Dam Valve Condition Assessment

Rampart Dam Valve Condition Assessment

RAMPART DAM VALVE CONDITION ASSESSMENT Colorado Springs, Colorado About the Project Colorado Springs Utilities (CSU) has numerous pump and valve stations throughout its system that are confidential for security reasons and extremely important to operations. AE2S was hired to assess valves, electrical, SCADA, and other items in a key tunnel adjacent to the dam, including […]

Great Falls Water Storage Assessment and Related Improvements

Water Storage Assessment and Related Improvements

WATER STORAGE ASSESSMENT AND RELATED IMPROVEMENTS Great Falls, Montana About the Project The City of Great Falls maintains several water storage facilities located within its distribution system. In 2012, the City retained AE2S to conduct detailed assessments for five steel storage facilities. The Seasonal Clearwell at the Water Treatment Plant (WTP) site (2 million-gallon ground […]