Provo River Watershed Council Strategic Plan

Provo River Watershed Council Strategic Plan Provo River Watershed/Wasatch Front, Utah Issues that the Council was Trying to Solve with this Project The Council needed a framework for prioritizing their involvement (leading or supporting) with watershed initiatives aimed at protecting water quality in the Provo River, which is a major water supply source for the […]
Spearfish Creek Floodplain Analysis

SPEARFISH CREEK FLOODPLAIN ANALYSIS Spearfish, South Dakota About the Project Spearfish Creek is the main stream flowing through the City of Spearfish (City) and was included in the City’s original 1981 Flood Insurance Rate Maps (FIRMs). As the city expanded north, revised floodplain mapping in 1990 extended north past Interstate 90. As with many communities […]
Rocky Boy’s/North Central Montana Regional Water System

ROCKY BOY’S/NORTH CENTRAL MONTANA REGIONAL WATER SYSTEM Rocky Boy’s Reservation and North Central Montana About the Project The Chippewa Cree Tribe of the Rocky Boy’s Reservation and the State of Montana, through the Reserved Water Rights Commission, negotiated a settlement of the Tribe’s Water Rights Claims. The Compact, ratified by the 1997 Montana Legislature and […]
Fargo Membrane Water Treatment Plant UV System

LIME SOFTENING WATER TREATMENT PLANT PRETREATMENT & CRYPTOSPORIDIUM COMPLIANCE Fargo, North Dakota New Classification in the Sheyenne River Recent sampling on the Sheyenne River discovered an increase in Cryptosporidium (Crypto) concentration, which reclassified the Fargo Lime Softening Water Treatment Plant (LSWTP) from Bin 1 to Bin 2 per the Long-Term 2 Enhanced Surface Water Treatment […]
Schoolmarm Water Storage Tank Improvements and Distribution Pipeline Replacement

School Marm Water Transmission Replacements Keystone, Colorado Project Overview The one-million-gallon Schoolmarm Water storage tank is the only water storage source that feeds Snake River Water District’s base 2 pressure zone. Upon completion of a risk assessment during AE2S’s SRWD Master Plan, the 12-inch ductile iron pipe that connects this tank to the system was […]
PFAS Sampling Assistance and Treatment Options

PFAS Sampling Assistance and Treatment Options Keystone, Colorado Project Purpose AE2S worked collaboratively with Snake River Water District (SRWD) to develop an investigation of the level of PFAS contamination in SRWD facilities and design a treatment alternative to meet the proposed PFAS regulations. In addition, AE2S is assisting SRWD in obtaining CDPHE PFAS SB 20-218 […]
Helena, Montana Water Treatment Plant System Master Plan

WATER TREATMENT PLANT MASTER PLAN Helena, Montana Looking Toward the Future The City of Helena was looking for a 20-year roadmap for their water treatment service that would address aging infrastructure, increase operating efficiencies and reliability, and provide for population growth. Required details included addressing regulatory requirements, strategies to improve system operations, maintenance and asset […]
Bozeman Pear Street Booster Station Rehabilitation

Pear Street Booster Station Rehabilitation Bozeman, Montana The Need for the Project The City of Bozeman retained AE2S to rehabilitate the Pear Street booster station. The project allows the City to maximize its use of Lyman Spring water, which requires no treatment and flows by gravity into a portion of the distribution system. The project […]
Ken-Caryl Water System Improvements and PRV Replacements

Ken-Caryl Water System Improvements and PRV Replacements Littleton, Colorado Project Overview Ken-Caryl Ranch Water and Sanitation District retained AE2S to complete a condition assessment of 29 pressure reducing valves and one 16-inch altitude valve that are contained in buried vaults throughout the system. The assessment consisted of field investigations of the vaults to evaluate the […]
Great Falls Water Treatment Plant Solids Mitigation

WATER TREATMENT PLANT SOLIDS MITIGATION Great Falls, Montana The Need for the Project The Great Falls WTP treats water from the Missouri River using a series of processes, including a traveling bar screen to remove large debris from the raw water intake stream and sedimentation/filtration, utilizing aluminum sulfate (alum) as the primary coagulant, to remove […]