Fargo Effluent Reuse Facility

MUNICIPAL WASTEWATER TO EFFLUENT REUSE Fargo, North Dakota Project Details Date: 2023 – 2024Client: City of Fargo Helping Wastewater Reuse Become a Reality Spurred by a request to provide up to 1.4 million gallons per day (MGD) to the new Tharaldson Ethanol Plant, the City of Fargo made the decision to construct an Effluent Reuse […]
Soy Crush Plant WW Design

SOY CRUSH PLANT WASTEWATER DESIGN Enderlin, North Dakota Project Details Date: 2020 – 2022Client: ADM Pumping and Wastewater Treatment Needs A large industrial client with a factory in North Dakota was experiencing difficulties with maintaining effective wastewater treatment. AE2S was hired to evaluate current flows and loads, establish existing treatment capacity and provide recommendations for […]
Grand Forks Regional WTP Structural Engineering

GRAND FORKS REGIONAL WTP STRUCTURAL ENGINEERING Grand Forks, North Dakota Project Details Date: 2015 – 2020Client: City of Grand Forks The Need for a New Regional Water Treatment Plant The Grand Forks Regional Water Treatment Plant (GFRWTP) is a 20 million gallons per day hybrid water treatment facility that includes a parallel conventional and membrane […]
Stark County Courthouse

STARK COUNTY COURTHOUSE Dickinson, North Dakota Project Details Date: 2016 – 2018Client: JLG Archutects Courthouse Addition The Stark County Courthouse Addition is constructed directly adjacent to the existing 1930s courthouse building and connected with a multi-level connecting link hallway. The addition provides approximately 16,300 square feet of new space, is three stories in height, and […]
Grand Forks Regional Water Treatment Plant Electrical System

GRAND FORKS REGIONAL WTP ELECTRICAL ENGINEERING Grand Forks, North Dakota Project Details Date: 2015 – 2016Client: City of Grand Forks About the Project The new Grand Forks Regional Water Treatment Plant (WTP) is capable of treating raw water from either of the City’s source waters with a treatment capacity between 16 and 20 million gallons […]
Williston Public Works Facility

WILLISTON PUBLIC WORKS FACILITY Williston, North Dakota About the Project The rapid growth resulting from the Bakken shale oil play caused Williston to look at construction of a new public works facility. AE2S assisted the City with selection of an architect and a construction manager at-risk for the project. Once an architect was selected, AE2S […]
Western Area Water Supply System SCADA System

SCADA SYSTEM Western North Dakota About the Project The Western Area Water Supply Authority (WAWSA) SCADA System provides remote monitoring and control of the entire Western Area Water Supply Project. The project consists of two water treatment plants (WTPs) and more than 30 remote water storage reservoirs, pumping stations, and truck fill depots located throughout […]
Fargo Red River Pump Station 3D Scanning

RED RIVER PUMP STATION 3D SCANNING Fargo, North Dakota About the Project The City of Fargo’s Red River Pump Station serves as the primary pumping facility to supply source water to its 45 million gallon per day (MGD) Water Treatment Plant (WTP). To accommodate the increased demands brought on by the addition of West Fargo […]
Fargo Water Treatment Plant Control System Upgrade

WATER TREATMENT PLANT CONTROL SYSTEM UPGRADE Fargo, North Dakota About the Project An Instrumentation and Control System Needs Assessment performed by AE2S showed that the Water Treatment Facility’s Supervisory Control and Data Acquisition (SCADA) System was outdated and out of support with no upgrade path. With no support options, the facility was at risk in […]
Grand Forks UND School of Medicine and Health Sciences

UND SCHOOL OF MEDICINE AND HEALTH SCIENCES Grand Forks, North Dakota About the Project AE2S served as the civil engineer on the design team led by JLG Architects for a new School of Medicine and Health Sciences (SMHS) on the UND Campus. The new facility is prominently located on a seven-acre site at the corner […]