AE2S is Advanced Engineering and Environmental Services

Soy Crush Plant WW Design

SOY CRUSH PLANT WASTEWATER DESIGN Enderlin, North Dakota Project Details Date: 2020 – 2022Client: ADM Pumping and Wastewater Treatment Needs A large industrial client with a factory in North Dakota was experiencing difficulties with maintaining effective wastewater treatment.  AE2S was hired to evaluate current flows and loads, establish existing treatment capacity and provide recommendations for […]

Stark County Courthouse

Structural Engineering Stark County Courthouse

STARK COUNTY COURTHOUSE Dickinson, North Dakota Project Details Date: 2016 – 2018Client: JLG Archutects Courthouse Addition The Stark County Courthouse Addition is constructed directly adjacent to the existing 1930s courthouse building and connected with a multi-level connecting link hallway. The addition provides approximately 16,300 square feet of new space, is three stories in height, and […]

Grand Forks Regional Water Treatment Plant Electrical System

GRAND FORKS REGIONAL WTP ELECTRICAL ENGINEERING Grand Forks, North Dakota Project Details Date: 2015 – 2016Client: City of Grand Forks About the Project The new Grand Forks Regional Water Treatment Plant (WTP) is capable of treating raw water from either of the City’s source waters with a treatment capacity between 16 and 20 million gallons […]

Williston Public Works Facility

Williston Public Works Facility

WILLISTON PUBLIC WORKS FACILITY Williston, North Dakota About the Project The rapid growth resulting from the Bakken shale oil play caused Williston to look at construction of a new public works facility. AE2S assisted the City with selection of an architect and a construction manager at-risk for the project. Once an architect was selected, AE2S […]

Basin Electric Laramie River Station Dust Collector Project

Laramie River Station Dust Collector Project

LARAMIE RIVER STATION DUST COLLECTOR PROJECT Laramie, Wyoming About the Project Basin Electric Power Cooperative generates power for rural electric cooperatives throughout the mid-west. Part of their generation capacity includes coal fired power plants. Basin Electric owns a controlling interest and operates the Laramie River Station in Wheatland, WY. The power plant is required to […]

Burnsville SCADA Integration and Control Systems

Burnsville SCADA Integration and Control Systems

SCADA INTEGRATION AND CONTROL SYSTEMS Burnsville, Minnesota About the Project AE2S was instrumental in the City of Burnsville’s SCADA and controls system improvements design and implementation in 2008. We continue to be the City’s sole provider of SCADA services including site rehabilitation controls design and consulting, controls improvements budgeting, PLC programming, SCADA programming, and site […]

Western Area Water Supply System SCADA System

Western Area Water Supply SCADA System

SCADA SYSTEM Western North Dakota About the Project The Western Area Water Supply Authority (WAWSA) SCADA System provides remote monitoring and control of the entire Western Area Water Supply Project. The project consists of two water treatment plants (WTPs) and more than 30 remote water storage reservoirs, pumping stations, and truck fill depots located throughout […]

Watertown Municipal Utilities Water System Controls Improvements

Watertown Municipal Utilities Water Systems Improvements

WATER SYSTEM CONTROLS IMPROVEMENTS Watertown, South Dakota About the Project The aging infrastructure within the Water Treatment Plant (WTP) created reliability and operation and maintenance issues for Watertown Municipal Utilities (WMU). As a result, WMU retained AE2S to design and build a 6.8 MGD expansion of the existing WTP, along with a new well field […]

Tiber County Water District Control Systems Upgrade

Tiber County Water District Control Systems Upgrade

CONTROL SYSTEMS UPGRADE Conrad, Montana About the Project Due to the age and proprietary nature of the existing control system, Tiber County Water District realized the need for a system upgrade in order to increase reliability, efficiency, and functionality. The previous telemetry system was a proprietary and obsolete telephone tone system using paper chart recorders […]

Fargo Red River Pump Station 3D Scanning

Fargo Red River Pump Station 3D Scanning

RED RIVER PUMP STATION 3D SCANNING Fargo, North Dakota About the Project The City of Fargo’s Red River Pump Station serves as the primary pumping facility to supply source water to its 45 million gallon per day (MGD) Water Treatment Plant (WTP). To accommodate the increased demands brought on by the addition of West Fargo […]