Grand Forks Regional Water Treatment Plant Electrical System

GRAND FORKS REGIONAL WTP ELECTRICAL ENGINEERING Grand Forks, North Dakota Project Details Date: 2015 – 2016Client: City of Grand Forks About the Project The new Grand Forks Regional Water Treatment Plant (WTP) is capable of treating raw water from either of the City’s source waters with a treatment capacity between 16 and 20 million gallons […]
Minnetonka Water Treatment Plant Electrical Upgrades

MINNETONKA WATER TREATMENT PLANT ELECTRICAL UPGRADES Minnetonka, Minnesota About the Project The City of Minnetonka has eight small water treatment plants (WTPs) which each consist of one remote submersible well, one vertical turbine well, two booster pumps, and two filters. The age of all electrical equipment within the WTPs was beyond its useful life, and […]
Minnetonka Ridgedale Booster Station Improvements

RIDGEDALE BOOSTER STATION IMPROVEMENTS Minnetonka, Minnesota About the Project The City of Minnetonka identified the need to rehabilitate the Ridgedale Booster Station and selected AE2S for the design, bidding, and construction phase services for the project. The booster station rehabilitation includes the removal and replacement of the entire existing electrical equipment, including electrical for three […]
Great Falls Gore Hill Pump Station Electrical Improvements

GORE HILL PUMP STATION ELECTRICAL IMPROVEMENTS Great Falls, Montana About the Project The City of Great Fall enlisted AE2S to complete the final design of electrical improvements at the Gore Hill Pump Station. The pump station consists of three split-case horizontal booster pumps, ranging from 75-200 horsepower, with an approximate capacity of 4 million gallons […]
Fargo Membrane Water Treatment Plant and Improvements Electrical Engineering

FARGO MEMBRANE WATER TREATMENT PLANT AND IMPROVEMENTS ELECTRICAL ENGINEERING Fargo, North Dakota About the Project The Fargo Water Treatment Plant uses membrane filtration and reverse osmosis to disinfect raw water prior to distribution. Reverse osmosis is an electrical energy intensive treatment technology and its implementation necessitated multiple electrical distribution system upgrades. Project Details Date: 2010 […]
Pump Station Electrical System Jordan Valley Utah

Pump Station Electrical System Jordan Valley, UT Project Details Date: 2020 – 2023Client: Jordan Valley Water Conservancy District AE2S Pump Station Design AE2S completed the design for a new 51.7 MGD pump station to replace existing infrastructure and meet future projected demand. The new station runs in parallel with the existing facility, until the existing […]