Tiber County Water District Control Systems Upgrade

CONTROL SYSTEMS UPGRADE Conrad, Montana About the Project Due to the age and proprietary nature of the existing control system, Tiber County Water District realized the need for a system upgrade in order to increase reliability, efficiency, and functionality. The previous telemetry system was a proprietary and obsolete telephone tone system using paper chart recorders […]
Bozeman Drought Resiliency Planning

DROUGHT RESILIENCY PLANNING Bozeman, Montana About the Project Situated near the headwaters of the Gallatin River watershed, the City of Bozeman has an advantageous location with respect to pristine water quality, but the City is extremely dependent on snowmelt runoff and adequate snowpack, along with natural and constructed reservoir storage, to provide an adequate supply […]
Rocky Boy’s/North Central Montana Regional Water System SCADA Services

SCADA SERVICES North Central Montana About the Project The Rocky Boy’s/North Central Montana Regional Water System (RB/NCMRWS) Project is intended to address the water quantity and quality challenges of the Rocky Boy’s Reservation and numerous off-reservation communities, water districts, and other water utilities represented by the North Central Montana Regional Water Authority (NCMRWA). Project Details […]
Great Falls WTP and Distribution System SCADA Improvements

GREAT FALLS WTP AND DISTRIBUTION SYSTEM SCADA IMPROVEMENTS Great Falls, Montana About the Project AE2S assisted the City of Great Falls with the development of a scheduled maintenance program for the WTP control system and its associated instrumentation and hardware. The City contracted AE2S to complete this preventative maintenance, as well as perform all on-call […]
Great Falls Gore Hill Pump Station Electrical Improvements

GORE HILL PUMP STATION ELECTRICAL IMPROVEMENTS Great Falls, Montana About the Project The City of Great Fall enlisted AE2S to complete the final design of electrical improvements at the Gore Hill Pump Station. The pump station consists of three split-case horizontal booster pumps, ranging from 75-200 horsepower, with an approximate capacity of 4 million gallons […]
Great Falls Storm Drain Design Manual

STORM DRAIN POLICY UPDATES AND DRAIN DESIGN MANUAL Great Falls, Montana Project Description The City of Great Falls needed to develop new stormwater policies and update their Storm Drain Design Manual (SDDM). The project involved three main segments: a new Regional Treatment Facility (RTF) funding policy and tracking tool; a new contractor erosion control training […]
Great Falls Water Storage Assessment and Related Improvements

WATER STORAGE ASSESSMENT AND RELATED IMPROVEMENTS Great Falls, Montana About the Project The City of Great Falls maintains several water storage facilities located within its distribution system. In 2012, the City retained AE2S to conduct detailed assessments for five steel storage facilities. The Seasonal Clearwell at the Water Treatment Plant (WTP) site (2 million-gallon ground […]
Rocky Boy’s/North Central Montana Regional Water System Water Treatment Plant Ground Storage Reservoir

Rocky Boy’s WTP Ground Storage Reservoir About the Project In 2018, as part of the Rocky Boy’s/North Central Montana Regional Water System Project, AE2S began design efforts for the Rocky Boy’s Water Treatment Plant (WTP) Project. During the design process, the need for 3 million gallons of on-site storage was identified. With the approximate size […]
Great Falls Water Treatment Plant Solids Mitigation

WATER TREATMENT PLANT SOLIDS MITIGATION Great Falls, Montana The Need for the Project The Great Falls WTP treats water from the Missouri River using a series of processes, including a traveling bar screen to remove large debris from the raw water intake stream and sedimentation/filtration, utilizing aluminum sulfate (alum) as the primary coagulant, to remove […]
Bozeman Pear Street Booster Station Rehabilitation

Pear Street Booster Station Rehabilitation Bozeman, Montana The Need for the Project The City of Bozeman retained AE2S to rehabilitate the Pear Street booster station. The project allows the City to maximize its use of Lyman Spring water, which requires no treatment and flows by gravity into a portion of the distribution system. The project […]