Skip to content
Home » AE2S Project News

AE2S Project News

Freshwater and Produced Water Gathering System

Williams County Freshwater and Produced Water Gathering System

Hydraulic design of parallel high density polyethylene (HDPE) pipelines for the purpose of gathering production water from oil extraction pads and delivering freshwater to the client for fracking and wellbore maintenance. Review of design drawings and cross referencing service connections with North Dakota Industrial Commission (NDIC) data. Develop production water decline curve for forecasting required hydraulic capacity. Right-of-way (ROW) easement verifications and associated Geographical Information System (GIS) progress depiction. Develop specification for hydrostatic testing

Rugby Wind Turbine Surveying Services

Rugby Wind Turbine Surveying Services

AE2S was hired by Wanzek Construction to provide surveys for the Rugby Wind Turbine Project in Pierce County, North Dakota during the summer of 2008. The project consisted of six surveying categories as listed below:

Permian Salt Water Disposal

150K BWPD Permian Salt Water Disposal

The facility expansion consists generally of increasing the capacity of the existing 90k bpd produced water processing & injection facility to 150k bpd. Design highlights include:

BDM Rural Water System Services

BDM Rural Water System Services

BDM Rural Water System retained AE2S to deliver a variety of services it needed. Services included planning updates to the west side of the system to meet existing and future capacity needs, treatment facility and distribution system water quality optimization, and general support to the BDM management and operational staff

Fargo Membrane WTP and Improvements Electrical Engineering

Fargo Membrane Water Treatment Plant and Improvements Electrical Engineering

The new Grand Forks Regional Water Treatment Plant (WTP) is capable of treating raw water from either of the City’s source waters with a treatment capacity between 16 and 20 million gallons per day (MGD). The WTP utilizes a combination of unit processes including pretreatment, ultrafiltration (UF), reverse osmosis (RO), lime softening, ozonation, biologically activated carbon (BAC) filtration, and chlorine/chloramine disinfection

Woodbury SCADA Design and Implementation

Woodbury SCADA Design and Implementation

The City of Woodbury encountered major challenges with their SCADA system, drawing attention to the need for replacement. AE2S assisted with the design process and provided technical expertise and collaboration for the SCADA system design update. AE2S first completed a comprehensive system assessment to perform a detailed review of the existing SCADA system and associated equipment

Grand Forks Regional Water Treatment Plant Electrical System

Grand Forks Regional Water Treatment Plant Electrical System

The new Grand Forks Regional Water Treatment Plant (WTP) is capable of treating raw water from either of the City’s source waters with a treatment capacity between 16 and 20 million gallons per day (MGD). The WTP utilizes a combination of unit processes including pretreatment, ultrafiltration (UF), reverse osmosis (RO), lime softening, ozonation, biologically activated carbon (BAC) filtration, and chlorine/chloramine disinfection