Advanced Engineering and Environmental Services, Inc.
Client Gateway Project Bidding Employee Gateway
AE2S - Think Big. Go Beyond
Infinite Menus, Copyright 2006, OpenCube Inc. All Rights Reserved.
Spacer Image Spacer Image Spacer Image
Layout Image
Layout Image Spacer Image
Riverbend Development

City of Hillsboro , ND

 

  Spacer Image
  Layout Image Spacer Image

 

Home > Riverbend Development
 

Riverbend DevelopmentIn an effort to raise the City of Hillsboro’s visibility as a housing option, the City, along with the Hillsboro Economic Development Council (HEDC), has been promoting the City as “one to-go cup of coffee away from Fargo and Grand Forks”.  The City saw a need for a new residential housing development and hired AE2S to design new underground infrastructure and street construction for the new Riverbend Addition. 

The project consisted of a new sanitary lift station, new water and sewer utilities systems, the construction of new curb and gutter with a bituminous street surface, and new street lighting.  The bituminous street section consisted of a 12” aggregate base course, geotextile fabric, drain tile tied into storm sewer to ensure adequate subsurface drainage, and 4 ½” of asphalt pavement.  Approximately 2206 lineal feet of reinforced concrete (RCP) storm sewer was placed in this project.  To accommodate the new ditch regrading, shaping, and drainage associated with the East Side drainage project, dual 36” RCP culverts were placed under the two new approaches to the Riverbend Addition.  Construction began in July 2004 with the ribbon cutting ceremony in October.

 

 

 

Copyright © 2008 AE2S - All Rights Reserved